Dig Out WNY is a foundation contractor serving Buffalo, NY and nearby Erie and Niagara County towns. We excavate basements and footing trenches, set footers below the frost depth your building department lists, and build trench-pour, poured concrete and block foundations, slabs on grade, and foundations for additions and garages. We also replace failing block walls and install perimeter drain tile.
Every foundation in Buffalo, NY has to do three things at once: carry the load, stay below the frost, and hold back wet clay year after year. That is the work we do. We excavate the basement or footing trench, set footers on undisturbed soil at the depth your building department requires, then build the walls, slab and drain tile everything else stands on. It is the first stage of new home construction and most home additions, and the fix when an old block wall gives out.
You deal with one contractor from bare ground to backfill. Pricing starts with a visit to the lot, where we check equipment access, where water goes now, and what your plans call for. Then we dig, form and pour or lay block, install drain tile, dampproof, and backfill once the walls are ready to take it. Homeowners and commercial property owners in Erie and Niagara counties reach us directly, since we answer our own phone.
What is included
There is no single frost depth for Western New York. The Residential Code of New York State leaves that number to the local building department, which fills it in on Table R301.2 for each city, town or village it covers. The state Department of State lists what those departments can weigh in setting it: the air freezing index, soil type, water table depth and local history. The Town of Lancaster building department's posted 2025 table, for example, lists a 42-inch frost line and a 50 psf ground snow load. Your municipality may list a different figure, so we dig to the figure your building department sets and your approved plans show, not a rule of thumb.
Depth is only part of it. The code also says:
All of New York falls in the code's severe weathering category. Under that rating, footer and wall concrete that will freeze and thaw during construction has to be air-entrained, and wall faces left exposed to the weather, garage floors, porches and steps call for stronger air-entrained mixes than a buried footer does.
Fine-grained lake-bed clay and silt lie under much of Erie County. A U.S. Army Corps of Engineers study done for the Town of Amherst found those lacustrine soils blanket much of that town and the wider region, and rated those lake soils in Amherst medium to high for expansion potential. Its soil borings also showed a soft stratum beneath the central and northern parts of the town.
The Corps pointed to four likely sources of sideways pressure on basement walls: the weight of the soil, clay swelling as it gets wet, water pressure, and frost. Of the houses it inspected, about 93 percent had walls without adequate lateral support at the top. It also flagged three common events that can strain that soft layer and shift the house above it: digging out a basement, piling a lot of new fill around a house to raise the yard, and a long-term drop in groundwater.
That shapes how we work. If the trench shows soft gray clay, seeping water or old buried fill, you and your designer hear about it before any concrete goes in. The code lets a building official require a soil test where expansive or compressible soil is likely, and on a lot in Amherst or a similar clay pocket, that conversation is worth having early.
The right foundation depends on what sits on it and how the soil behaves. Your plans or your engineer make the call; here is how the common types differ once they are in the ground.
Whichever type you pick, the excavation decides whether it performs: the right depth, a flat undisturbed bottom, and enough room around the outside to form, lay block and set drain tile.
When a block wall has bowed inward, sheared along a mortar joint or started to lean, the fix is often to take that wall out and build a new one. It is a bigger job than it sounds, because the house is still sitting on it. The usual sequence runs like this:
We handle the digging, the tear-out, the rebuild and the backfill. We do not design the repair and will not guess at one; that belongs to the engineer and your building department. The spoil pile and equipment path are planned around your driveway and fences, and the job ends with grading that sends water away from the new wall.
Clay holds water against a wall, so the drain at the footer matters as much as the concrete. The state code requires drains around concrete or masonry foundations that retain earth and enclose habitable or usable space below grade. In the trench, that looks like this:
The outside of the wall is dampproofed from finished grade down to the top of the footer, or to 6 inches below the basement floor if that is higher. Block walls get at least 3/8 inch of cement parging first unless the coating is approved for bare block. Dampproofing slows soil moisture. It is not waterproofing, which the code calls for where a high water table is known, and we do not sell it as one.
Last comes the ground itself. The code calls for 6 inches of fall in the first 10 feet away from the wall, with paved surfaces inside that 10 feet pitched at least 2 percent away. Where the lot can't give you that, swales or yard drainage carry the water off instead.
How it works
We look at the lot, equipment access, where water runs now and what your plans and permit call for, then price the job from what we actually saw.
The locate request goes in through 811, and member utilities have two business days after the filing day to respond. They don't mark private lines, so we ask about garage feeds, sprinkler lines and your sewer lateral.
The hole is cut to the depth on your plans, with sides sloped, benched or shored as OSHA requires from 5 feet down, or shallower if the ground looks ready to cave. Soft spots get flagged before any pour.
Footers are formed and poured, walls are poured or laid in block, and drain tile, stone and dampproofing go on the outside, ready for the inspections your building department schedules.
Once the walls are braced or tied into the floor framing, we backfill in layers and shape the ground to fall away from the house, ready for finish work.
Service areas
Pick your town to see what digging and building there involves, or call and we will tell you straight away whether we can get to you.
Questions & answers
As deep as the frost line your city, town or village lists, and never less than 12 inches below undisturbed ground. New York's residential code lets each local building department set that figure in its own Table R301.2, so there is no single number for the region. One Erie County town's table, for example, lists 42 inches. Check with the building department that issues your permit; we dig to the depth it lists.
It depends on the garage's size and construction. The state code exempts free-standing, light-frame accessory buildings of 600 square feet or less, with an eave height of 10 feet or less, from frost protection. An attached garage never qualifies. A 24-by-24 garage is 576 square feet, just under that limit; a 24-by-30 is not. Larger garages need footings below the frost line or another method the code allows, such as a frost-protected shallow foundation. Confirm with your building department first. If an old garage has to come down, our garage tear-downs clear the way.
A trench pour uses the ground as its form, while a poured wall is built with forms on top of a separate footer. For a trench pour, the trench is cut to exact width down to frost depth and filled with concrete to just above grade, which saves forming time on garages and additions without basements. A poured wall starts with a formed footer, then wall forms go on top, which is how full basement walls are built. Clay that holds a clean vertical cut suits a trench pour; caving soil does not.
Mostly sideways pressure from wet, heavy clay, plus frost and settlement. A U.S. Army Corps of Engineers study for the Town of Amherst pointed to soil weight, clay swell, water pressure and frost as four suspected causes of the push on basement walls, and found fine-grained lake-bed soils across much of Erie County and Western New York. Poor drainage and walls without solid support at the top make it worse. A bowing wall needs an engineer's evaluation first; the excavation and rebuild come after.
Yes, when an engineer finds the other walls and footers sound, a single wall can be rebuilt on its own. We dig out the outside of that wall, the house is shored, the old block comes out, and a new wall goes up to the engineer's drawings with fresh drain tile and dampproofing. The other walls stay put. The scope depends on the wall's length, how the house is framed, and what is in the way outside, like a porch or a slab that needs a driveway rip-out first.
For a basement, almost always. The Residential Code of New York State requires drains around concrete or masonry foundations that retain earth and enclose habitable or usable space below grade, and its only exception is a foundation on well-drained sand or gravel, which lake clay is not. The pipe sits at or below the top of the footer in washed stone covered with filter fabric, and it drains by gravity or to a sump. A slab addition or frost wall with no space below grade falls outside that rule, so your plans and building department decide what goes in there.
Related work
Ground-up new homes, from clearing the lot and setting the foundation through utilities and final grade.
Room and garage additions on footings dug below frost and tied properly to your existing house.
Basement digs, footing and utility trenches, and backfill placed in compacted lifts for Western New York clay.
Trenching for water services, electric and data conduit and gas lines, with proper bedding and cover.
Recreational, farm and storm water ponds dug to depth, with the outlet and overflow planned in.
Houses and buildings taken down safely, utilities capped, debris hauled off and the lot left graded.
Call or text (716) 444-6613 with your plans or a photo of the wall that worries you. We'll walk the site and give you a straight estimate.