Excavation
Basement digs, footing and utility trenches, and backfill placed in compacted lifts for Western New York clay.
Grading in Buffalo, NY means reshaping the ground so rain and snowmelt run away from buildings and off paved areas instead of pooling. Dig Out WNY handles rough and finish grading for homes and commercial properties: yard regrades that meet the state's 6-inches-in-10-feet fall from a foundation, subgrades for driveways and parking lots, and topsoil finish grades ready for seed or sod.
If water sits against your foundation every March, or one corner of the lawn stays a pond for days after a storm, the problem is usually the shape of the ground. We regrade yards and lots across Buffalo, NY so rain and snowmelt have a downhill path away from the house, the garage and the neighbor's side yard. That means cutting the high spots, filling and compacting the low ones, and finishing with topsoil at a slope you can still mow.
Grading is also the step that decides whether the next project drains. A gravel driveway, a patio or a parking lot only sheds water as well as the subgrade under it, and new grass only thrives on a finish grade that doesn't hold puddles. We handle rough grading for driveways, roadways and parking lots, level bases for walks and patios, and topsoil set up for hydroseeding or sod, on residential and commercial properties across Erie and Niagara counties.
What is included
New York doesn't leave foundation grading to taste. Section R401.3 of the 2025 Residential Code of New York State says lots shall be graded to drain surface water away from foundation walls, and the ground has to drop no less than 6 inches over the first 10 feet out from the wall. Where lot lines, walls or other barriers make that impossible, the code calls for drains or swales instead, and any hard surface within 10 feet of the foundation must slope at least 2 percent away from the building, roughly a quarter inch per foot.
Whether or not your house was built to that rule, it's the right target for a regrade, and older yards often drift away from it. Backfill along a foundation settles over the years, flower beds get built up with mulch, and a walk that once pitched outward ends up tipping back toward the wall. We measure the fall from the foundation outward before anything moves, so you know exactly how far off the yard is.
Past that first 10 feet, the ground still has to keep heading downhill. Cornell's lawn guidance for New York calls for a yard that slopes away from the house in all directions, dropping at least 2 or 3 inches every 10 feet. On a tight lot where a fence, a driveway or the property line leaves no room for the full 6 inches, that's where a shallow swale or a yard drain or catch basin earns its keep.
Large stretches of flat ground in Erie and Niagara counties are lake-plain soil, silt and clay that settled out in glacial lakes, and it drains like it. The USDA's description of the Lakemont series, whose reference profile was described in the Town of Wheatfield in Niagara County, calls it poorly to very poorly drained, formed in very slowly permeable, reddish clay lake sediments, and found on nearly level ground and slight depressions. Water that lands on soil like that can't soak in fast, so it goes wherever the surface sends it. If the surface sends it nowhere, it sits.
That changes how a low spot gets fixed. Dumping loose topsoil into a soggy dip treats the symptom; it settles, and the puddle returns smaller but still there. The lasting fix is to strip the sod, bring the area up with fill placed in thin compacted lifts, cap it with topsoil and, most important, tie it into a slope that gives the water an exit.
Timing matters on clay too. Cornell names traffic on moist soil as the most common cause of compaction, and wet clay under a loaded machine smears into a dense layer that roots and water struggle to get through. Not sure what's under your lawn? Squeeze a moist pinch between thumb and finger; if it forms a sticky ribbon longer than 2 inches, Cornell says you're on clay.
Every hard surface is only as good as the dirt shaped under it. Before stone goes down for a driveway or a parking lot, the subgrade gets cut to the same pitch and cross-slope the finished surface will have, soft pockets are dug out and replaced, and the whole area is compacted. That way water that works down through the stone still drains along the subgrade instead of pooling under it and heaving when it freezes.
Patios and walkways follow the same rule on a smaller scale. A slab against the house should pitch away from the wall, and the 2 percent the state code sets for hard surfaces near a foundation on a tight lot is a sensible floor anywhere. We shape the base grade so the finished surface sits at that pitch without extra sand shimmed in to fake it.
Commercial lots bring more water and more paperwork. A parking lot sheds rain in sheets, so the grade has to aim it at catch basins, a curb line or a swale. If a project will disturb one or more acres of soil, the owner or operator needs coverage under the New York State Department of Environmental Conservation's stormwater permit for construction activity before work starts. The general permit in force now, GP-0-25-001, runs through January 2030 and calls for an electronic Notice of Intent plus a Stormwater Pollution Prevention Plan. We grade to the plan your engineer draws, and cut-and-fill balancing on larger parcels falls under our site work and site development service.
Inside Buffalo city limits, standing water is a code issue as well as a nuisance. Section 341-6 of the City of Buffalo Code, in the property maintenance chapter, says surface and subsurface water shall be appropriately drained to protect buildings and structures and to prevent the development of stagnant ponds. The same section bars any building from discharging roof drainage onto a sidewalk, stairs or neighboring property.
That second line shapes how a city regrade gets designed. On a narrow lot, the easy move is to tip everything toward the side yard and let the neighbor deal with it. A proper regrade keeps the water on your side of the line instead, moving it along a shallow swale or into a drainage system, in line with the state code's rule that surface drainage be diverted to a storm sewer or another approved point of collection that doesn't create a hazard.
Section 341-12, the part of the chapter on unoccupied hazards, adds that the area a removed or demolished building covered is to be graded to the level of the lot. It's a fair standard for any house or garage demolition: the job isn't finished until the ground is. Suburban towns and villages write their own rules on importing fill, removing topsoil and drainage, so outside the city, ask your building department before soil is hauled in or out.
Topsoil is the finish coat, not the thing that creates the slope. If a yard is shaped with topsoil alone, that soft layer settles and washes unevenly, and the low spots reappear by the second spring. We set the slope in the subsoil during rough grading, firm it up so it won't sink, and then spread topsoil over it at an even depth so the finished surface follows the same fall.
How deep? Cornell's lawn guide, written with New York lawns in mind, says establishing at least 4 inches of topsoil is essential, and it recommends checking pH before planting, with 6.0 to 7.5 as the target range. Adjusting pH is easiest while the soil is still loose and nothing is planted.
The surface gets raked smooth, with rocks, roots and construction debris pulled out, and firmed so a shoe leaves only a shallow print. From there it's ready for hydroseed or sod. If you have a choice on timing, Cornell rates mid-August through September as the most favorable stretch for starting grass from seed, thanks to cooler temperatures, adequate moisture and less weed competition. When you're ready to set a date, send us the address and a few photos of the yard.
How it works
We walk the property with you, note where water collects and where downspouts dump, check how the yard sits against the neighbors, and measure the existing fall away from the foundation.
Grading counts as excavation under New York's Part 753 rule, so UDig NY gets the locate request two to ten working days before work starts, the call day excluded. Private sprinkler or lamp-post lines may go unmarked, so flag them.
High spots get cut, low spots get filled in thin lifts and compacted, and the subsoil is shaped so it already carries the fall the finished yard needs.
Topsoil goes on at an even depth over the shaped subgrade, then gets raked smooth, cleared of rocks and debris, and firmed so it holds its slope.
Lawn areas are ready for hydroseed or sod right away. Driveway, patio and parking areas move on to stone base while the subgrade is still clean and dry.
Service areas
Pick your town to see what digging and building there involves, or call and we will tell you straight away whether we can get to you.
Questions & answers
At least 6 inches of drop in the first 10 feet out from the foundation. That's the figure in the 2025 Residential Code of New York State. Where a fence, wall or lot line makes that impossible, the code calls for drains or swales plus a 2 percent pitch on any concrete or asphalt within 10 feet of the wall. Farther out, Cornell's lawn guidance says a yard should keep sloping away from the house at least 2 or 3 inches every 10 feet, so water doesn't gather in the middle of the lawn.
Sometimes, and the answer comes from your city or town rather than from a contractor. Each municipality sets its own rules on bringing in fill, hauling soil away and working near ditches or easements, so check with the City of Buffalo or your town building department and describe the work before it starts. Bigger jobs add a state layer: once a site disturbs an acre or more of soil, the DEC's stormwater permit for construction activity applies too.
For a shallow dip, yes; for a true low spot on clay, dirt alone rarely holds. A hollow under an inch deep can be topdressed with topsoil and reseeded. A spot that holds water for days usually needs the sod stripped, compactable fill placed in thin layers, a topsoil cap and a slope that gives the water somewhere to go. Filling a hole with loose soil and no outlet just gives you a softer puddle next spring.
It often helps, but only with water that comes from surface runoff. If the basement gets wet along the walls after a heavy rain or a fast melt, a grade that tips back toward the house is a common culprit, and fixing it takes that load off the foundation. Water pushing up through the floor from a high water table, or leaking through a failed wall, needs a different fix, such as footing drains or foundation and block wall work.
Whenever the soil is dry enough to work, which on clay usually means waiting out the spring thaw. Grading saturated clay packs it into a dense layer that drains even worse, and Cornell names traffic on moist soil as the most common cause of compaction. If the job ends with seed, finishing in time to plant between mid-August and the end of September hits the window Cornell rates most favorable. Sod can go down through most of the growing season, and spring seeding works too, though both need more watering to get through summer heat.
It shouldn't, and in Buffalo it isn't allowed for roof water. The city's property maintenance code bars discharging roof drainage onto neighboring property, and the state residential code says surface drainage has to be diverted to a storm sewer or another approved point of collection that doesn't create a hazard. A good regrade moves water along a swale on your side of the line, or into a drain line or catch basin, not over the fence.
Related work
Basement digs, footing and utility trenches, and backfill placed in compacted lifts for Western New York clay.
Clearing, cut and fill, building pads, utilities and grading sequenced for residential and commercial sites.
Building lots, fence lines and overgrown acreage cleared, with forestry mulching that leaves the ground covered.
Recreational, farm and storm water ponds dug to depth, with the outlet and overflow planned in.
Old detached garages, sheds and slabs removed, even at the far end of a tight city driveway.
In-ground and above-ground pool removal, fill-ins compacted the right way, and digs for new pools.
Call or text (716) 444-6613, send a photo of where the water sits, and we'll walk the lot before we price the regrade.