Demolition
Houses and buildings taken down safely, utilities capped, debris hauled off and the lot left graded.
Dig Out WNY handles pool excavation and removal in Buffalo, NY and across Erie and Niagara counties. In-ground pools come out by full removal or by a fill-in, where the floor is broken for drainage, the walls are knocked down and clean fill is compacted in layers under topsoil. We also tear down above-ground pools, remove pool decks and dig for new in-ground pools.
A pool nobody swims in still eats your weekends and your budget: opening and closing, chemicals, a liner that's overdue and a fence you can't let slide. We take pools out across Buffalo, NY, whether it's a vinyl-liner pool on steel walls or a gunite shell, and leave you a level yard ready for grass. Heading the other direction and want a new pool? We dig that hole too.
The first decision is yours, and it shapes the whole job. A fill-in leaves the lower shell buried with its floor broken open, while a full removal takes every piece out so nothing is left underground. Before quoting, we come see the pool in person, work out how a machine reaches the backyard, and ask what you might do with that ground in five or ten years. Then you'll get a straight answer on which approach fits.
What is included
A partial removal, usually called a fill-in, is the common choice when the yard is going back to lawn. The pool is drained, the floor is broken through in several places so water can escape, and the coping, bond beam and top of the walls are knocked down into the hole. Clean fill goes in over that rubble in compacted layers, then topsoil. The lower shell stays buried for good.
A full removal hauls out every piece: liner, wall panels, concrete, rebar and plumbing. The hole is backfilled with compacted fill, and if you might build there someday, an engineer can test that compaction so a record exists. It means more trucking and more imported material, but nothing is left underground to explain to an inspector, a buyer or the next contractor.
Three questions usually settle it:
A concrete pool floor left in one piece is a bowl. Fill it with dirt and it still catches every bit of rain and snowmelt that soaks down through the fill, and a waterlogged fill-in becomes a soft, sinking patch of lawn that never quite dries. That's why the floor gets broken clean through, not just cracked, before anything goes in.
The ground around Buffalo raises the stakes. The NRCS describes the Odessa series, one of the red, lake-laid clays found across the Erie-Ontario plain, as somewhat poorly drained, with low or moderately low saturated hydraulic conductivity in the substratum. Put simply, once water reaches that clay it leaves slowly. The openings in the floor have to be large and numerous enough to let water out at clay's pace, and the fill directly over them should drain freely.
Timing matters as well. An empty shell sitting in saturated ground can be pushed upward by the water around it, so a drained pool shouldn't sit empty for weeks before the floor is opened. If the yard around the old pool was already soggy, fix that with yard drainage while the equipment is on site.
How the teardown goes depends on how the pool was built.
The equipment pad, pump, filter, heater, skimmer and return lines leave with the pool. The concrete deck or patio can go too; breaking and hauling slab concrete is the same work as our driveway rip-outs. A pool house or shed in the way is a small demolition job that can be folded in.
Much of what makes a new in-ground pool last happens in the dig. The hole follows the pool plans: the footprint, the shallow-to-deep profile and working room around the walls so the installer can set panels and bracing or form the shell. We dig to the plans and grades that you or your pool installer provide.
Paperwork comes before the machine. The Town of Amherst's posted pool packet is a good example of what to expect. It requires a building permit for any pool that is constructed or excavated, asks for a survey showing the pool with a grade and drainage plan, wants a letter from National Grid stating it has no objection to the proposed pool, and says the permit must be issued before any work, including excavation. Other towns and the city run their own processes, so check yours before a dig date is set. Our Amherst service area page covers more about working there.
Then there's the dirt. The pool itself, 16 by 32 feet and averaging five feet deep, works out to roughly 95 cubic yards of soil in place before you add the working room around the walls, and all of it bulks up once it's dug loose. Decide early whether it gets trucked out or spread to reshape the yard; if it stays, that's a grading plan, not a pile. Rain that falls into an open hole in clay stays there, so expect some pumping after a wet week. Plan the route in, too: the excavator and dump trucks need a clear path to the backyard, which often means a fence section comes out for a while.
Rules for taking out a pool are set locally, and they aren't uniform. The Town of Tonawanda's posted demolition requirements, for instance, call for a site secured with fencing, clean fill with documented custody and an inspection before any fill is placed. Ask your building department whether your removal needs a permit, whether an inspector wants to see the broken floor, and whether rubble may stay in the hole.
Inside the City of Buffalo, the pool chapter of the city code requires every pool to be enclosed by an unclimbable fence at least four feet high with a self-closing, lockable gate. A drained pool with its floor broken open is a deep hole lined with jagged concrete, so keep that enclosure closed until the hole is filled, with temporary fencing across any section pulled out for machine access.
If you plan to sell, remember that most New York sellers of one- to four-family homes must deliver a Property Condition Disclosure Statement before the buyer signs the contract. Its questions about certificates of occupancy and about drainage problems that leave standing water can touch an old pool site. Keep the permit, the inspector's sign-off and photos of the opened floor with your house records.
How it works
We look at the equipment route, fence sections that have to come down, overhead wires and trees, then settle with you on a fill-in or a full removal.
The 811 request goes in, and an electrician should disconnect the pool circuit. Utilities don't always mark private lines, such as the buried wire to a pool filter, so point out any you know about.
The water goes where your municipality allows. Then the liner is cut, the floor broken through and the walls knocked down or removed, with steel, liner and debris hauled off.
Clean fill goes in one layer at a time, each compacted before the next, instead of the hole being dumped full and left to settle on its own over the winter.
Topsoil goes over the fill, shaped so water runs away from the house and off the old pool spot, then seeded or hydroseeded to bring the lawn back.
Service areas
Pick your town to see what digging and building there involves, or call and we will tell you straight away whether we can get to you.
Questions & answers
The machine work on a typical backyard fill-in is usually a matter of days, and a full removal of a gunite shell takes longer. What stretches the calendar is everything around the digging: the permit, the wait for 811 marks, getting an electrician out to disconnect the pool, and weather. Wet clay can't be compacted properly, so a rainy stretch can pause the fill. You'll get a realistic schedule once we've seen the pool, the access and your town's requirements.
Treat a partial fill-in as unbuildable unless an engineer says otherwise. A buried shell with broken concrete and fill over it can settle unevenly under a footing, and whoever designs the foundation will want to know exactly what is in the ground. If there's any chance you'll build on that spot, choose full removal with the backfill compacted in lifts and tested. That gives a foundation something known to sit on.
Ask your real estate attorney, because the answer depends on your facts. New York's disclosure form has no question that names a filled-in pool. It does ask whether the property has certificates of occupancy and whether drainage or grading problems have left standing water, and it warns that a knowingly false or incomplete statement can expose a seller to claims from the buyer. Either way, keep the permit, any inspection sign-off and photos of the broken-out floor where you can find them.
For most in-ground pools in the city, into the sewer system. Buffalo's code says a pool over 1,500 cubic feet, about 11,200 gallons, must discharge into the sewer when drained, and a 16-by-32 pool averaging five feet deep holds roughly 19,000 gallons. Smaller pools can go to the sewer or be drained another way, as long as the water doesn't run onto neighboring property or create a hazard. Suburban towns and villages set their own rules, so check before the pump starts.
It shouldn't, as long as the fill was compacted in thin lifts over a floor that was properly opened up. Dips usually trace back to fill dumped in one pass and left to settle, sod or brush buried in the hole, or an intact floor holding water under the fill. Should the spot dip a little after its first freeze-thaw season, it gets topped with topsoil and reseeded, and hydroseeding is a quick way to cover a large bare patch.
Yes. We excavate for new in-ground pools, working to the plans and grades from you or your installer, and the spoil can be hauled away or used to reshape the yard. The permit has to be in hand first; Amherst's pool packet, for one, says no work, including excavation, begins until the permit is issued. Mark the pool outline before the 811 request so the locate covers the right area, and point out any private lines, like old lighting wires, you know about.
Related work
Houses and buildings taken down safely, utilities capped, debris hauled off and the lot left graded.
Old detached garages, sheds and slabs removed, even at the far end of a tight city driveway.
Asphalt and concrete driveways broken out, hauled away and the base made ready for new pavement.
Sewer lateral replacement and repair, tie-ins to the main, and new cleanouts where you need them.
Footers, poured and block foundations, slabs on grade and block wall replacement.
Room and garage additions on footings dug below frost and tied properly to your existing house.
Call or text (716) 444-6613 and we'll set a time to walk the yard, check access and talk through fill-in versus full removal.