Home Additions
Room and garage additions on footings dug below frost and tied properly to your existing house.
New home construction in Buffalo, NY with Dig Out WNY covers the whole ground phase of a build: clearing the lot, excavating the basement, setting footings below the local frost line, foundation drains, water and sewer trenches, backfill, grading, driveway stone and a seeded lawn. We build from your architect's or engineer's plans for owners in Buffalo and across Erie and Niagara counties.
A lot of what goes wrong with a new house around Buffalo starts underground in the first few weeks, then gets buried where nobody looks again. A footing poured on frozen clay. Backfill shoved against a wall before the floor is framed. A yard that pitches toward the basement instead of away from it. Dig Out WNY builds new homes in Buffalo, NY, and we do that groundwork ourselves instead of handing it to whichever excavator is free that week.
You bring the plans; we bring the sequence. Nothing gets priced until we've stood on the lot with your drawings, and from there we carry the job from clearing and topsoil stripping through excavation, the foundation, utility trenches, backfill and final grade, and on up through the house itself. That way the excavation and foundation inspections land when the ground is actually ready for them. We build on city infill lots and open suburban parcels alike, from Buffalo neighborhoods out through Erie and Niagara counties.
What is included
On a new build, the number that matters most isn't on the excavator. It's the elevation of the top of the foundation, and three things fix it before anyone digs. First, the sewer: the building drain has to fall by gravity from the basement to the connection at the street, or any fixtures below that line need a pump. Inside the City of Buffalo, Sewer is one of the departments that reviews new-construction plans, so that connection gets settled on paper first.
Second, the yard. The Residential Code says the ground beside the house has to drop 6 inches within 10 feet, and on a flat lake-plain lot the simplest way to get that fall is usually to set the house a little proud of the surrounding grade. Set it too low and water heads toward it forever; set it too high and you're buying fill and adding steps.
Third, frost. New York leaves the frost line to each building department, which lists a minimum footing depth below finish grade in its Table R301.2. The Town of Lancaster, for example, lists 42 inches. On a raw lot, finish grade is a line on the site plan, not the ground you're standing on, so footing depth gets measured from the planned grade rather than the existing dirt. Our grading work builds the yard to that plan at the end.
A lot of the ground around Buffalo settled out at the bottom of glacial lakes. NRCS describes Rhinebeck soils, mapped across the Erie and Ontario lake plains, as somewhat poorly drained soils formed in clayey lake sediments, with slow permeability in the subsoil. Clay like that can carry a house, but only when the footing sits on undisturbed, unfrozen ground or on fill that was engineered and compacted to carry it.
Without a soils report, the code assumes clay and silt carry 1,500 pounds per square foot and sizes footing width off that value. If the building official suspects the ground under your lot is weaker, a soils investigation sets the number instead. Soft, wet pockets, old uncontrolled fill, or the buried basement of a house that once stood on a city infill lot fall short, so we dig those out to firm ground and replace them with compacted stone or whatever your engineer specifies, rather than pour over them.
Frozen soil is the other trap. The code bars footings from bearing on it, which matters every winter here. On a cold-weather dig the trench bottom stays covered until the pour, and any layer that froze anyway comes out first. In Buffalo, the excavation inspection lands at this point, with the foundation inspection close behind. Our foundation and basement work covers the walls themselves.
The code is blunt about timing: backfill can't go against a foundation wall until the wall has cured enough and is anchored to the floor framing above, or is braced. Push wet clay against a green wall with no deck on it and you can bow or crack it on day one. Because we're building the house too, the first-floor deck goes on before the machine comes back, and nobody is tempted to backfill early just to free up an excavator.
Before the hole closes, the code also wants a drain around any foundation that holds back earth and encloses living or usable space below grade. Only well-drained gravel and sand soils (the code's Group I) get a pass, and lake clay is neither, so tile, washed stone and filter fabric go in along the footing and run to a sump or another approved outlet. Roof water stays out of that system; downspouts get their own storm water drainage lines.
Then comes what goes back in the hole. The code's soil table flags high-plasticity fat clays, elastic silts and organic soils as unsuitable backfill, and a lake-plain basement dig can turn up fat clay. We sort the spoil as we dig, keep the worst of it out of the zone beside the wall, and place fill in lifts, compacting each one so the ground next to the house doesn't slump into a moat by the second spring.
On a new build, water and sewer both start from nothing, and each supplier sets its own rules. Where the Erie County Water Authority supplies the water, its new-service application asks for a copy of the building permit, so the permit comes before the water application. The owner's line from the right-of-way to the house goes at least 5 feet down, in its own trench, and that depth follows the finished grade. If the yard will be cut down later, the pipe goes deeper now. Its end is left sticking up at the property line with a stake marked for water so the authority's crew can find it.
Before a trench opens, we file the 811 locate request with UDig NY. State law gives contractors a window: at least two full working days and no more than 10 working days before digging. Utilities mark their own lines, not private ones, so on a lot with an old garage feed or a line left from a previous house, we probe and hand-dig wherever the plans and the ground disagree.
Gas and electric service trenches follow each utility's own depth and routing specs. Every trench gets bedded and backfilled in lifts so the lawn over it doesn't sink a year later. More on that side of the job is on our underground utilities page.
The driveway base goes in near the start of the job, not the end. Concrete trucks, lumber deliveries and dumpsters need a firm way onto the lot, and on clay a rutted mud track gets dragged into the street and has to be dug out later anyway. So we strip the topsoil and soft subsoil along the driveway line, lay geotextile fabric on the clay so the stone doesn't punch down into it, and place crushed stone in compacted lifts. It carries construction traffic through the build and gets topped off at the end, ready for paving or left as stone. If a city lot needs a new opening through the curb, the curb cut needs its own approval from City Engineering and Public Works before the project moves forward. Our driveway and base work page has more.
The topsoil stripped on day one sits in its own pile the whole time, kept apart from the clay spoil. After the backfill has settled and the rough grade checks out, it's spread back, raked to finish grade and hydroseeded so the lawn holds the new slopes while it grows in. The final inspection follows, and in Buffalo, passing it closes the permit with a certificate of occupancy.
How it works
We walk the site with your drawings and survey, check grades against the neighbors, find where water and sewer will come from, and pick spots for the topsoil pile and spoil.
Your plans go to the building department, and no machine moves until the permit is issued. We file the 811 request inside the two-to-ten working day window.
Trees and brush come out, topsoil is stripped and stockpiled, the driveway base goes in, and the hole is dug to plan elevations and checked for firm, unfrozen soil.
Footings and walls go in, then drain tile, stone and filter fabric. Backfill waits until the floor is framed or the walls are braced, then goes in compacted lifts.
The house goes up from your plans, with framing and rough-in inspections along the way. Finish grade, topsoil and hydroseed wrap up the site before the final inspection.
Service areas
Pick your town to see what digging and building there involves, or call and we will tell you straight away whether we can get to you.
Questions & answers
We set it from three things: the sewer, the drainage and the frost line. The basement has to sit high enough for the building drain to reach the street connection by gravity, or the lowest fixtures need a pump. The yard needs 6 inches of fall within 10 feet of the walls, so on flat lots the house usually sits a bit above the surrounding grade. And footing depth is measured from the planned finish grade. Your plans carry those elevations; we stake and dig to them.
The whole house, built from your plans, starting with the ground phase. That covers clearing, excavation, the foundation, drains, utility trenches, backfill, grading, the driveway base and the lawn. Above that, the house goes up to your drawings and the permit, with the building department's framing, rough-in and final inspections along the way. The plans themselves come from your architect or engineer, and we build what they draw.
Yes. The City of Buffalo requires an original seal and signature from a New York State architect or engineer on the plans for all new buildings. We build from those drawings, so bring your architect's set, or a stock plan your design professional has adapted to the lot and sealed. Outside the city, submittal requirements vary by municipality, so check with the town or village building department where your lot sits.
We stop, show you what turned up, and work out the fix with your designer before digging further. Solid rock is one of the ways the code allows a footing to be protected from frost, so bedrock in the hole isn't automatically bad news, though it can change the basement depth or mean breaking rock. An old foundation, cistern or rubble fill is different: it comes out and gets replaced with engineered fill, placed and compacted to your engineer's spec, so the new footing doesn't straddle hard and soft spots.
Not where the Erie County Water Authority supplies the water: its new-service instructions say the water line can't go in the same trench as the sewer or other utilities. So a new build usually gets two trenches, each cut to its own depth. The water service goes at least 5 feet below finished grade to stay out of the frost, and the sewer runs at whatever pitch carries it to the street connection. If your water comes from a city, town or village system instead, we confirm its rule at plan review.
Usually, yes, as long as it is stripped before excavation starts and kept away from the clay spoil. We scrape it off the house footprint, driveway and work area first, stockpile it where trucks won't run over it, and spread it back at finish grade. If the lot is short on topsoil, or it came up full of roots and stone, it gets screened or topped up with imported topsoil before seeding. Keeping it separate from day one is far cheaper than buying it back.
Related work
Room and garage additions on footings dug below frost and tied properly to your existing house.
Footers, poured and block foundations, slabs on grade and block wall replacement.
In-ground and above-ground pool removal, fill-ins compacted the right way, and digs for new pools.
Sewer lateral replacement and repair, tie-ins to the main, and new cleanouts where you need them.
Rough and finish grading that turns water away from your foundation and leaves a level, usable yard.
Asphalt and concrete driveways broken out, hauled away and the base made ready for new pavement.
Call or text (716) 444-6613 and we'll walk your lot with the plans in hand before we price the build. We answer our own phone.